AIMS - Points of Presence

Points of Presence

Our data centre presence covers key locations around Southeast Asia, bringing AIMS expertise to the region and offering overseas customers varied options to establish their data centres in Asia.

Menara AIMS (fka Menara Aik Hua), Kuala Lumpur

Our flagship facility, Menara AIMS is strategically situated within the central business district of Kuala Lumpur and offers the widest choice of networks in Malaysia, connecting customers with a dynamic ecosystem of networks, carriers and IT service providers.

Building Information
Address Menara AIMS, Changkat Raja Chulan, 50200 Kuala Lumpur, Malaysia
Building Information
  • Single block 18-storey commercial building and 3 basement parking levels.
  • The building consists of 10 data centre floors and 3 sub-floors for the installation of mechanical and electrical facilities and power plants.
Power Supplies 11kV HT power feed from TNB power grid
Power Capacity 10 MVA
Telecommunication Manhole
  • Dual manhole for the incoming telecommunication fibre path
  • Diverse fibre trunking from manhole sub-duct to the data centre floor
Antenna, Wireless or Microwave Equipment Space at Rooftop
  • Yes
  • The UPS and EPG backup power are provided to rooftop IDU Room
  • Dedicated grounding system for the ODU is installed at the rooftop. This earth point is linked to the existing building’s basement earth chamber.
  • Multimode fibre backbone links rooftop IDU Room to the data centre.
Site Specification
Ground Floor 2,500 sq ft
Mezzanine Floor 2,500 sq ft
Level 1 6,500 sq ft
Level 2 6,500 sq ft
Level 3 6,500 sq ft
Level 4 6,500 sq ft
Level 5 6,500 sq ft
Level 6 6,500 sq ft
Level 7 6,500 sq ft
Level 8 6,500 sq ft
Building Floor Information
Floor Height 3.8 meter, slab to slab
Floor Load 5 k-N per square meter
Data Centre Specification
Critical Load Power Density 100 watts per sq ft
Cooling Density 120 watts per sq ft
Rack Arrangement/ Space Configuration
  • Hot aisle and cold aisle configuration:
  • Cold Aisle Spacing: 1,200mm
  • Hot Aisle Spacing: 1,000mm
Critical Load Power Distribution 1 x primary and 1 x redundant final sub-circuits from separate PDU within the data centre
Lighting 500lux light density at the raised floor
Raised Floor System
Gross Raised Floor Area Per Floor 6,500 square feet
Usable Raised Floor Area 5,000 square feet
RAF Height 600mm raised floor height
RAF Type HPL wood-core rigid grid system
Concentrated Load 4.5 kN
Uniform Load 12 K-N per square meter
Underfloor Insulation Thermal isolation trocellin polyethlene foam
Perforated Panel Perforated panels are placed at the cold aisle
Construction/ Partition
Ceiling No false ceilings for data centre areas
Partitions 2 hours fire rated partition for each IG55 fire zone
Cabling System Two tier overhead structured cabling system and infrastructure
Uninterruptible Power Supply (UPS) System
UPS System
  • True-online Double Conversion Static UPS
  • DRUPS is installed to protect data centre critical loads
Static UPS Capacity 2 x 1200kVA and 800kVA
Total Statis UPS Capacity 3200kVA
UPS Battery Autonomy 10 minutes at full load
DRUPS Capacity 3300kVA
UPS Redudancy 2N configuration/ N+1with IP Bus configuration
UPS External Bypass Provided
Synchronization Load bus synchronization is installed
Earthing System
Dirty Earth
  • Dirty and clean earths are available at the data centre area
  • The dirty (electrical) earth system is linked to existing building electrical earth
  • All electrical earth/ bonding is connected to the main dirty earth bar including the raised floor system pedestals bonding
Clean Earth Clean earth point is provided to each rack location under the raised floor
Power Distribution Unit (PDU)
PDU Configuration
  • Each PDU receives one 415Vac protected power supply from an UPS output panel within the data centre.
  • PDU is equipped with Digital Power Meter, KWH Meter. The power meters provide the electrical consumption reading of the PDU through the KWH meter or digital meter via Building Management System (BMS) interface
Isolation Transformer K-13/ K-20 rated isolation transformer is included in each PDU
PDU Capacity 200kVA/225kVA
Circuit per Cabinet
  • For 2N configuration
  • 1 x primary and 1x redundant final circuit from separate PDU. STS backup is provided at the primary source in the PDU level
Circuit Protection Each final circuit is individually protected by a MCB and isolation transformer at PDU.
Circuit Breaker Sizes Single phase 20A, 30A single phase and three phase power supplies are available from the PDU
AC voltage at Cabinet Level 240V/ 50 Hz , 415V/ 50 Hz
48V Direct Current (DC) Plant 2N configuration. The DC plant is supported by EPG
Direct Current (DC) Plant Capacity 2 x 2000A
Emergency Power Generator (EPG)
EPG Plant
  • 2 x 2MVA backup diesel generators
  • 3 x 1.1MVA backup diesel generators
  • 2 x 1MVA backup diesel generators
  • 2 x 500kVA backup diesel generators
Fuel Tank External fuel tanks able to support EPG plant for 24 hours at full load
Supported Services Data centre, CRACs, chillers, lighting and general services within data centre areas
Cooling
Chiller System Air cooled and water cooled, chilled water based ACMV system water is installed
Chiller Redundancy N+1 redundancy for chiller unit
Chiller System Support Chiller system is supported by EPG Plant and Dynamic UPS System
Chiller Pipe Dual chilled water piping system from chiller plant to the data centre floor and ring chilled water circuit within the data centre floor
CRAC System Down flow configuration computer room air condition unit
CRAC Redundancy CRAC system in the same farm area are configured in N + 1 and equipped with an automatic changeover controller
CRAC Power Redundancy Each CRAC is connected to two power sources from different ACMV panel via Automatic Transfer Switch (ATS)
CRAC System Support CRAC system is supported by EPG Plant
Supplement Cooling Overhead supplement cooling is installed to support high density load. Refrigerant gas pipes run from the supplement cooling distribution to the overhead supplement cooling system.
Temperature Control 22 Degree +/- 3º
Humidilty Control 50 RH +/- 10 RH
Containment Cold aisle containment with access control is available
Water Leakage Detection
Water Leakage Detection Water leak detection system is installed in data centre areas
Leak Detection Type Resistive leak tape (cable) monitoring leakage at any point along the perimeter of the data centre area and surrounding the CRACs
Fire Detection and Suppression Systen
Fire Suppression Inert Gas IG-55 fire suppression system is installed in the data centre areas
IG-55 IG-55 Gas suppression system is installed above and under the raised access floor in the data centre areas
Fire Alarm and Detection System Two stages of alarms are implemented for heat and smoke detection system
High Sensitivity Smoke Detection (HSSD) System HSSD system is implemented above CRAC and operated independently from the fire alarm system
Security
  • 24 x 7 on site security
  • Multi layered security controls
  • Card access control system at all data centre and building entrances and exits
  • 24 x 7 CCTV monitoring backed by digital recordings up to 90 days storage at multiple sites
Building Management System
Monitoring
  • Building Management System (BMS) to monitor and control all facilities within AIMS’ data centre
    • Automatic control and monitoring of the environmental control system
    • Monitoring of high tension supplies
    • Monitoring of UPS and backup generator systems
    • Monitoring of switchboard, PDU, fans, CRAC units
    • Monitoring of fire safety system
    • Monitoring of water leak detection
    • Monitoring of room temperature and RH
On Site Manned Support
  • 24 x 7 Service Operation Centre
  • 24 x 7 Facility Management team
Awards and Accreditations
  • ISO/IEC 27001:2013 Information Security Management System
  • ISO 9001: 2008 Quality Management System
  • ISO/IEC 20000-1 Information Technology Service Management (ITSM)
  • Payment Card Industry Data Security Standard (PCI DSS)
  • Computerworld Readers Choice Awards for Cloud IaaS category in 2015
  • ‘Data Center Service Provider of The Year’ by Frost & Sullivan in 2006, 2014 & 2016
  • ‘Best Data Centre Engagement of The Year’ by Outsourcing Malaysia Excellence Award in 2011

CJ1 Centre, Cyberjaya

A purpose-built Tier II data centre in the Multimedia Super Corridor (MSC) of Malaysia, featuring advanced infrastructure, energy efficient data centre management solutions and dark fibre connectivity to Menara AIMS.

Building Information
Address Jalan Cyber Point 4, Cyber 8, 63000 Cyberjaya, Selangor, Malaysia
Power Supplies 2 x 11kV incomers from 2 sources
Power Capacity 2 x 1200kVA
Telecommunication Manhole Dual diversed jC9C manhole
Satelite Roof space available for satellite and antenna equipment
Site Specification
Data Centre Block
  • Gross: 6,320m2 (68,000 ft2)
  • Data Centre Space: 3,200m2 (34,500 ft2)
Office Block
  • Gross: 4,213m2 (45,352 ft2)
  • Office Space: 1,965m2 (21,150 ft2)
Building Floor Information
Floor Load
  • 10.0kN/m2 in data center area
  • 15kN/2 for M & E Room
Clear Height 4.50m (concrete floor to ceiling)
Raised Floor 0.80m
Column Grid 8.00m
Minimum Accessible Height (Door and Ceiling) 2.40m
Perimeter Fencing
  • 2.40m height galvanized anti-climb fence along perimeter
  • Boom barrier
  • Mild steel sliding gate at entrance
Passenger Lift 1,020kg lift – 900mm (W) x 1550mm (D) x 2100mm (H)
Goods Lift 1,905kg lift – 1550mm (W) x 2600mm (D) x 2600mm (H)
Car Parks 79 bays
Wall Insulation Double layer brick with cavity insulation wall construction
Roof Double layer concrete roof slab to prevent water leakage
Roof Floor Loading 7.5kN/m2
Data Centre Specification
Critical Load Power Density
  • Min 60 watt per sq ft
  • Upgradable UPS Power
Cooling Density 80 watt per sq ft
Upgradable cooling density
Cabinet Dimensions 42RU 600mm (width) x 1000mm (depth)
Rack Arrangement/ Space Configuration
  • Hot aisle and cold aisle configuration:
  • Cold Aisle Spacing: 1,200mm
  • Hot Aisle Spacing: 1,000mm
Critical Load Power Distribution 1x   primary and 1 x redundant final sub-circuits from separate PDU and different power source
Lighting T5 lighting with 500 lux light density at the raised floor
Raised Floor System
Gross Raised Floor Area Per Floor 11,500 square feet
Usable Raised Floor Area 10,000 square feet
RAF Height 800mm
RAF Type HPL cementations rigid grid
Concentrated Load 4.5kN/m2
Uniform Load 13kN/m2
Underfloor Insulation Thermal isolation trocellin polyethylene foam
Perforated Panel Perforated panels are placed at the cold Aisle
Construction/ Partition
Ceiling No false ceiling ini data centre areas
Window No window within data centre areas
Data Centre Wall Double layer brick with cavity insulation wall construction
Two Tier Overhead Structured Cabling System
  • Overhead fiber channel system for multi-mode and single-mode patch cords
  • Overhead cable basket system for UTP and coaxial cabling
Uninterruptible Power Supply (UPS) System
UPS System
  • N+1 and 2N options with minimum 10 minutes backup
  • Transformerless Type True Online Double Conversion Static UPS
Static UPS Capacity 400kVA per module
Total Statis UPS Capacity 2 x 1200kVA
DRUPS Capacity 400kVA per module
UPS Redudancy N+1 and 2N options
Distribution 415V busbar system
Transformers
  • 2x 3MVA cast resin dry type transformers
  • Expandable up to 12MVA cast resin transformers
  • Compartmentalized to 2 different transformer rooms
Diesel Generators
  • 2x 2MVA diesel generator
  • Expandable up to 8MVA diesel generatorsN + 1 Configuration
  • Compartmentalized to 2 different transformer rooms
Fuel Storage Over 48 hours support at full load
Fuel Delivery 4 hours response
Gen-set Supported Services UPS, data centre CRACs, lighting and general services
UPS External Bypass Provided
Earthing System
Clean Earth Available
Power Distribution Unit (PDU)
PDU Configuration 2N PDU
Isolation Transformer K-13 rated isolation transformer is included in each PDU
PDU Capacity 200kVA/225kVA
Circuit per Cabinet 1 x primary and 1 x redundant circuit from separate PDU
Circuit Protection Each final sub-circuit is individually protected by MCB and isolation transformer at PDU
Circuit Breaker Sizes
  • Single Phase 20A, 30A, 60A
  • Three phase breakers are available
AC voltage at Cabinet Level
  • 240V / 50Hz
  • 415V / 50Hz
Cooling
Chiller System Support CRACs system are supported by EPG plant
CRAC System Support CRACs system are supported by EPG plant
Temperature Control 22   Degree C +/- 2 C
Humidilty Control 50% RH +/- 10%
Cooling Configuration Down flow precision air conditioning
Type
  • Air cooled CRAC
  • Optional : Chilled water system and cold aisle containment system
Resilience N+1 with dual power supply to each CRAC unit
Water Leakage Detection
Water Leakage Detection Available under floor
Leak Detection Type
  • High sensitivity smoke detectors (HSSD)
  • Addressable heat and smoke detectors
Fire Detection and Suppression Systen
Detection
  • High sensitivity smoke detectors (HSSD)
  • Addressable heat and smoke detectors
Fire Suppression
  • Water mist system within data center (above and under floor) and common area
  • Handheld CO2 fire extinguisher
Security
  • 24 x 7 on site security
  • Multi layered security controls
  • Card access control system at all data centre and building entrances and exits
  • 24 x 7 CCTV monitoring backed by digital recordings up to 90 days storage at multiple sites
Building Management System
Monitoring
  • Temperature and humidity monitoring
  • M & E operations and power monitoring
  • Automatic monthly report generation
  • Customer EMS panel (optional)
On Site Manned Support
  • 24 x 7 Service Operation Centre
  • 24 x 7 Facilities Management team
  • 24 x 7 power and cooling engineers (for repair and maintenance; level 1 and 2 skills)
Awards and Accreditations
  • ISO/IEC 27001:2013 Information Security Management System
  • ISO 9001: 2008 Quality Management System
  • ISO/IEC 20000-1 Information Technology Service Management (ITSM)
  • Tier III Data Centre Design ceritified by Uptime Institute
  • Threats Vulnerabilities Risk Assessment (TVRA) compliant
  • Green Building Index (GBI)
  • Computerworld Readers Choice Awards for Cloud IaaS category in 2015
  • ‘Data Center Service Provider of Te Year’ by Frost & Sullivan in 2006, 2014 & 2016
  • ‘Best Data Centre Engagement of The Year’ by Outsourcing Malaysia Excellence Award in 2011

Suntech @ Penang Cybercity

Located in Penang's fast-growing Bayan Lepas Industrial Area, home to multinational and semiconductor companies, this facility enjoys MSC status and boasts excellent security characteristics for maximum protection.

Building Information
Address 1-12B-17 & 18, SUNTECH @ Penang Cybercity, Lintang Mayang Pasir 3, 11950 Bayan Baru, Penang, Malaysia
Building Information Single block 21 storey commercial building
Power Supplies 11kV HT power feed from TNB power grid
Telecommunication Manhole Manhole for the incoming telecommunication fibre path
Building Floor Information
Floor Height 4.45 meter, slab to slab
Floor Load 2.5 kN per square meter
Data Centre Specification
Critical Load Power Density 60 watts per sq ft
Cooling Density 60 watts per sq ft
Rack Arrangement/ Space Configuration
  • Hot aisle and cold aisle configuration:
  • Cold Aisle Spacing: 1,200mm
  • Hot Aisle Spacing: 1,000mm
Critical Load Power Distribution 1 x primary and 1 x redundant final sub-circuits from separate PDU within the data centre
Lighting 500 lux light density at the raised floor
Raised Floor System
Gross Raised Floor Area Per Floor 1,000 square feet
RAF Height 300mm raised floor height
RAF Type HPL cementatious rigid grid
Concentrated Load 4.5 kN
Uniform Load 12 K-N per square meter
Underfloor Insulation Thermal isolation trocellin polyethlene foam
Perforated Panel Perforated panels are placed at the cold aisle
Uninterruptible Power Supply (UPS) System
UPS System
  • Transformer less True-Online Double Conversion Modular Type Static UPS
  • UPS system is installed to protect data centre critical loads
Static UPS Capacity 20kVA per module
Total Statis UPS Capacity 60kVA
UPS Battery Autonomy 10 minutes at full load
UPS Redudancy N + 1 Configuration
UPS External Bypass Provided
Earthing System
Dirty Earth
  • Both dirty and clean earths are available at the data centre area
  • The dirty (electrical) earth system is linked to existing building electrical earth
  • All the electrical earth/ bonding are connected to the main dirty earth bar including the raised floor system pedestals bonding
Clean   Earth Clean earth point is provided to each rack location under the raised floor
Power Distribution Unit (PDU)
PDU Configuration
  • Each PDU receives one 400Vac protected power supply from UPS output panel within the data centre area
  • PDU is equipped with digital power meter, KWH meter and indicating lights
PDU Capacity 2 x 70kVA
Circuit per Cabinet 1 x primary and 1 x redundant final circuit from separate PDU
Circuit Protection Each final circuit is individually protected by MCB and RCCB at PDU
Circuit Breaker Sizes Single phase 20A, 30A single phase are available from the PDU
AC voltage at Cabinet Level
  • 230V/ 50 Hz
  • 400V/ 50 Hz
Emergency Power Generator (EPG)
EPG Plant 120KVA backup diesel generators
Fuel Tank External fuel tanks able to support EPG plant for 24 hours full load
Supported Services Data centre UPS, CRACs, chillers, lighting and general services within data centre areas
Construction/ Partition
Ceiling No false ceilings in data centre areas
Partitions 2 hours fire rated partition for each fire suppression zone
Cabling System The data centre is installed with structured cabling system and infrastructure
Cooling
CRAC Redundancy N+1 redundancy
CRAC System Support CRAC system is supported by EPG Plant
Temperature Control 22 Degree +/- 2º
Humidity Control 50% RH +/- 10% RH
Water Leakage Detection
Water Leakage Detection Water leak detection system is installed in data centre area
Leak Detection Type Resistive leak tape (cable) monitoring leakage at any point along the perimeter of the data centre area and surrounding the CRACs.
Fire Detection and Suppression System
Fire Suppression Data centre areas are installed with FM-200 fire suppression system
FM-200 FM-200 Gas Suppression System will be installed above and under the raised access floor in data centre areas.
Fire Alarm and Detection System Two stages of alarms are implemented for RM-200 heat and smoke detection system.
Security
  • 24 x 7 on site security
  • Multi layered security controls
  • Contactless card access system at all data centre door entrances and exits
  • 24 x 7 CCTV monitoring backed by digital recordings up to 90 days storage at multiple sites
Building Management System
Monitoring
  • Building Management System (BMS) to monitor and control the data centre areas
    • Automatic control and monitoring of the environmental control system
    • Monitoring of high tension supplies
    • Monitoring of UPS and backup generator systems
    • Monitoring of switchboard, PDU, fans, CRAC units
    • Monitoring of fire safety system
    • Monitoring of water leak detection
    • Monitoring of room temperature and RH
On Site Manned Support
  • 24 x 7 Service Operation Centre (SOC)
  • 24 x 7 Facility Management team
Awards and Accreditations
  • ISO/IEC 27001:2013 Information Security Management System
  • ISO 9001: 2008 Quality Management System
  • ISO/IEC 20000-1 Information Technology Service Management (ITSM)
  • Computerworld Readers Choice Awards for Cloud IaaS category in 2015
  • ‘Data Center Service Provider of The Year’ by Frost & Sullivan in 2006, 2014 & 2016
  • ‘Best Data Centre Engagement of The Year’ by Outsourcing Malaysia Excellence Award in 2011

Singapore

This highly secured, carrier neutral data centre is situated in Telstra’s Paya Lebar Data Centre (SGCS 2) and is part of the Pacnet Enabled Network (PEN), the first Pan-Asia Network-as-a-Service (NaaS) architecture that enables organisations to provision network resources within minutes across multiple sites.

SGCS2 interconnects with other PEN-enabled facilities to offer you the flexibility to create a truly virtual Asia-Pacific data centre.

Building Information
Address
  • 110 Paya Lebar Road, Singapore 409009
  • Adjacent to data centre cluster along Tai Seng Avenue
Building Information
  • Free standing data centre in a secure compound.
  • Gross Floor Area: 155,000 sq ft
  • Gross White Space: 45,000 sq ft
  • Total colocation racks capacity: 1500
  • 2 Cargo Lift – 5,500 lbs 1 Passenger lift – 2,200 lbs
  • 4,200 mm floor to ceiling height
  • 800 mm raised floor height
  • Floor loading: 10kN/sqm
  • Designed PUE: 1.69
  • Earthing and lightning protection systems installed
  • 500 lux lighting in data centre meeting AS1680.22 standard
  • All critical infrastructure and customer impacting infrastructure located on raised floor beds
Security Systems
  • External Perimeter fence with 24 x7 CCTV monitoring and guard patrols
  • Footage stored for 30 days
  • Mantraps to data hall
  • 2 factor authentication (biometric/ card)
  • Pre- authorized visitors only
  • Visitor logs are kept for one year
Electrical Infrastructure
  • 12 MVA Utility supply
  • Dual source power from power source to each rack (dual bus topology) with no common point of failure
  • N+1 distributed UPS (6,000 kVA)
  • 2 kVA standard power up to 6 kVA
  • 2N Power distribution to IT racks
  • 60,000 liters fuel capacity; equivalent to 24 hours run-time at full load
  • Fuel refill within 4 hours of activation
  • 10 minutes battery autonomy
  • N+2 diesel generator redundancy
  • 2N power distribution to IT racks
  • 2 x 32A CEEFORM power sockets per rack
  • 2 x AP8853 intelligent power strips per rack
Mechanical Infrastructure
  • High efficiency water-cooled chillers with N+1 redundancy
  • Thermal storage tanks for uninterruptable cooling
  • Dual, diverse chilled water risers
  • Cooling density up to 1.5kW/sqm in data centre
  • 20-25°C temperature
  • 50% +/- 20% relative humidity
  • N+20% CRACs
  • Racks deployed in 8-tile hot/ cold aisle
Fire Protection System
  • 24×7 decentralized monitoring of M&E plant room & redundant systems
  • Gaseous fire suppression and dry-pipe pre-action sprinklers
  • Very Early Smoke Detection Apparatus (VESDA)
  • Sub-raised floor water detection system installed around CRAC units and along perimeter of room
  • FM200 fire suppression
  • Doors and partitions minimally 2-hours rated
Communication Infrastructure
  • Meet-me-rooms integrated across operating footprint with access to multiple connected carriers
  • Direct access to major domestic exchanges and PoPs within Singapore
  • Access to Telstra’s global subsea cable network
  • Multiple redundant and diverse carrier networks for local access
  • 2 x physically diverse MDF rooms with separate manholes and lead-in pipes
  • 2 x physically diverse Meet-Me Rooms
  • 1-tier overhead cable basket and 1-tier fiber runner in data hall
Awards and Accreditations
  • Tier III facility certified by Uptime Institute
  • ISO/IEC 27001:2013 Information Security Management System
  • ISO 9001: 2008 Quality Management System
  • Payment Card Industry Data Security Standard (PCI DSS)
  • Threats Vulnerabilities Risk Assessment (TVRA) compliant
  • BCA-DIA Green Mark Gold Plus Award

Thailand

AIMS enjoys data centre presence in Thailand via our strategic alliance with T.C.C. Technology Co., Ltd. (TCCT) under the Asia Data Center Alliance.

TCCT is Thailand’s leading carrier-neutral data centre provider, offering commercial managed hosting and infrastructure solutions for organisations looking to outsource their information technology requirements.

TCCT currently operates two world-class data centres: one at the Empire Tower in downtown Bangkok and the other at Bangna complex in the city’s eastern suburbs, close to Bangkok’s international airport.

Want to know more about this service?